Calculate how many 25 kg bags of dry mortar, screed, self-leveling compound or concrete mix you need from area in m² and thickness in cm.
Material Standard (EN 998-1 / EN 206): Dry pre-mixed mortars require between 16 and 22 kg of dry powder per m² per centimeter of thickness.
| Site Application | Mix Ratio (Cement:Sand:Gravel) | Cement per m³ | Sand / Gravel per m³ | Water Approx. |
|---|---|---|---|---|
| M-5 Masonry / Rendering Mortar | 1 : 5 (No gravel) | 300 kg (12 bags) | 1,150 kg sand | 185 Liters |
| M-7.5 Floor Screed Mortar | 1 : 4 (No gravel) | 350 kg (14 bags) | 1,100 kg sand | 195 Liters |
| Lean / Blinding Concrete C12/15 | 1 : 3 : 5 | 225 kg (9 bags) | 680 kg sand / 1,150 kg gravel | 150 Liters |
| Structural Concrete C25/30 | 1 : 2 : 3 | 350 kg (14 bags) | 650 kg sand / 1,050 kg gravel | 175 Liters |
Pre-mixed dry screed requires ~18 to 20 kg per m² per cm of thickness: a 5 cm layer requires roughly 4 bags (100 kg) per m².
A standard 1:4 floor screed mix requires roughly 350 kg of Portland cement (14 bags of 25 kg) and 1,100 kg of washed sand per cubic meter.